45 Meters 3 Legged Angle Steel Antenna Tower for Samoan Client Trial Assembly
As shown in pictures is the trial assembly site of 45m 3 legged angle steel tower for our Samoan client. Trial assembly before hot-dip galvanization helps ensure that all components of the angle steel tower fit together correctly and align properly before galvanization. It allows for the identification of any discrepancies or issues in the assembly process that can be addressed and corrected before the final galvanization step.
Ensuring proper fit and alignment through trial assembly before galvanization can contribute to the long-term durability and performance of the angle steel tower, reducing the risk of premature corrosion or structural issues.